Case studies

Case studies from the power network.

A selection of recent civils delivery for DNOs, transmission and renewables clients across the UK.

Ashford EV Charging Station Civil Works
Ashford, Kent

Ashford EV Charging Station Civil Works

Complete civil works package for a new EV charging station, from pre-cast substation and LV foundations through supply cable installation, drainage, kerbing, surfacing, fencing and landscaping.

Pre-cast substation installationLV foundation constructionSupply cable excavation and reinstatement
Trefawr Solar Farm Civils
Trefawr, Wales

Trefawr Solar Farm Civils

Civil works package for a solar farm scheme in Wales, including internal ducting routes, transformer and switchroom foundations, HV cable installation, access track construction and earthing mat installation.

Internal ducting to solar farmTransformer foundationSwitchroom foundation
Peckham 11kV Cable Route Installation
Peckham, SE15, London

Peckham 11kV Cable Route Installation

Construction of a new 11kV cable route through busy South London streets, including excavation and ducting, installation of a pre-cast substation, cable pulling and full highway reinstatement.

Excavation for 11kV ductingPre-cast substation installation11kV cable installation
NW10 132kV Cable Duct Install
Brent, NW10, London

NW10 132kV Cable Duct Install

Installation of six 132kV Class 1 ducts in a dual-circuit formation with CBS surround through a densely serviced residential and commercial corridor in North West London, including full excavation, ducting and reinstatement.

Trial hole surveys132kV duct installationCBS surround
Iron Acton 132kV Cable Installation
Iron Acton, Bristol

Iron Acton 132kV Cable Installation

Installation of a single 132kV circuit — three separate phases plus 120mm earthing — from the customer point of connection to the National Grid point of supply, with one intermediate joint bay.

132kV cable pullingDuct brushing & provingJoint bay works