Case studies from the power network.
A selection of recent civils delivery for DNOs, transmission and renewables clients across the UK.

Ashford EV Charging Station Civil Works
Complete civil works package for a new EV charging station, from pre-cast substation and LV foundations through supply cable installation, drainage, kerbing, surfacing, fencing and landscaping.

Trefawr Solar Farm Civils
Civil works package for a solar farm scheme in Wales, including internal ducting routes, transformer and switchroom foundations, HV cable installation, access track construction and earthing mat installation.

Peckham 11kV Cable Route Installation
Construction of a new 11kV cable route through busy South London streets, including excavation and ducting, installation of a pre-cast substation, cable pulling and full highway reinstatement.

NW10 132kV Cable Duct Install
Installation of six 132kV Class 1 ducts in a dual-circuit formation with CBS surround through a densely serviced residential and commercial corridor in North West London, including full excavation, ducting and reinstatement.

Iron Acton 132kV Cable Installation
Installation of a single 132kV circuit — three separate phases plus 120mm earthing — from the customer point of connection to the National Grid point of supply, with one intermediate joint bay.