Projects
Case studies from the power network.
A selection of recent civils delivery for DNOs, transmission and renewables clients across the UK.
UK Distribution Network Operator·North West England
132kV Primary Substation Civils
Full civil delivery for a new 132kV primary substation compound including transformer plinths, cable basements and secure perimeter.
Earthworks & foundationsTransformer bundsCable containment
Regional DNO Framework·Midlands, UK
6.8km HV Cable Route Installation
Ducted HV cable route through a busy urban corridor including two arterial road crossings and a canal crossing by HDD.
Traffic managementDucted cable routeDirectional drilling
Independent Power Producer·South East England
Solar Farm Grid Connection Civils
Grid connection civils for a 49.9MW solar development including access track, DNO substation compound and internal cable network.
Access tracksSubstation compoundCable trenching
Tier-1 Utility Contractor·Nationwide
Utility Reinstatement Framework
Rolling reinstatement framework covering permanent highway and footway repairs following HV and LV cable works.
Permanent reinstatementPlaning & surfacingFootway repairs
Planning a substation build or cable route?
Talk to our team about your next scheme. We deliver from enabling works through to full reinstatement.
